banner-products news

The SOP of ETA SMT Machine Shipment

The SOP of ETA SMT Machine Shipment

The management of each company will be reflected in different places, even shipments. We have seen a lot of company machine wrapped in only a layer of plastic. I think no matter how good the quality of their machine and how advanced their functions are, we can see that the management level of this company is not high from their packaging.

So I want to share our ETA company shipment process. 
When the machine has been produced. Our test engineers will do the first step, which is testing and aging. They will take about one week to testing the machine, and check every function is OK and each problem that can be found.

Next, when the engineer passes the test, the equipment is delivered to the Delivery person. They will disassemble the equipment, not if it is an integrated equipment, and if it is a workbench or belt assembly line, they will disassemble each part and pack it separately.
ETA SMT Machines.jpeg
In the third step, they will pack the equipment with a layer of foam and then a layer of transparent plastic. This ensures that the surface of the equipment will not be scratched. Most of our goods are transported by sea. what we are most worried about is that the goods are moldy or rusty by moist air above the sea. So we will wrap another layer of metal bag on the outside of the equipment, and then draw out the air.
WechatIMG37.jpeg
Finally, we packed the wooden cases outside and shipped them out.
ETA SMT Machines.jpeg
When you see a set of our shipping process, I think you must think that we pay great attention to detail, the management of our company is very strict, your purchase of equipment is good value for money.
Share this entry